Commercial

Decarbonise your buildings without disrupting them

Heat pumps, solar PV and battery storage for schools, offices, churches and estates across Cambridgeshire.

Heat pumps

Heat pump installation across Cambridgeshire

Image mode.

Our process

From first call to handover

Four steps, one team, no hand-offs.

  1. Step 01

    Get in touch

    Tell us about the property and what you want to achieve. We reply with the questions we need answered for a proper estimate.

  2. Step 02

    Survey and design

    We visit, measure and assess insulation, space and electrics, then design a system around how you use energy.

  3. Step 03

    Quote and approval

    A fixed, itemised quote with grants and warranties spelt out. Nothing starts until you approve it.

  4. Step 04

    Install and commission

    Our engineers install tidily, commission the system, and walk you through the controls and paperwork.

Aerial view of solar panels being installed on a church roof in Cambridgeshire

Case study Cambridge · Air source heat pump cascade, 120 kW

Cambridge college heating decarbonisation

Replacing gas boilers with a 120 kW air source heat pump cascade across a listed college site, without closing a single building.

Carbon reduction
72%
Heat pump capacity
120 kW
Days of closure
0