The college wanted to cut carbon without disrupting term time. We phased the works around the academic calendar, retained live services throughout and commissioned each block before moving to the next.
Case study Commercial
Cambridge college heating decarbonisation
Replacing gas boilers with a 120 kW air source heat pump cascade across a listed college site, without closing a single building.
- Carbon reduction
- 72%
- Heat pump capacity
- 120 kW
- Days of closure
- 0