All projects

Case study Commercial

Cambridge college heating decarbonisation

Replacing gas boilers with a 120 kW air source heat pump cascade across a listed college site, without closing a single building.

Carbon reduction
72%
Heat pump capacity
120 kW
Days of closure
0
Aerial view of solar panels being installed on a church roof in Cambridgeshire

The college wanted to cut carbon without disrupting term time. We phased the works around the academic calendar, retained live services throughout and commissioned each block before moving to the next.

Talk to us about a similar project

Tell us about your property or building and we will come back with a scoped proposal, grants and warranties included.

Prefer to talk? Call 01223 646 462, Monday to Friday, 8am to 5pm.

Infinite Heating & Energy branded van with the Go Greener slogan